Construction and assembly of a quick-build hall with insulation. The hall is completely covered with double-layered roofing, with the mineral wool being laid before the second corrugated sheet roof is installed. The standard is a
60 mm thick mineral wool is used. Since this process takes place from the outside, you can also have existing halls insulated without having to clear them out or remove installations.